| 02.2004.02.03.10. Pembangunan/Rehabilitas/Peningkatan/Pengerasan Jalan Desa **) (PK. Kepala Seksi Kesejahteraan) |
| 5.2.1.07. Belanja Bahan Material |
PBH |
224.071.000 |
224.071.000 |
0 |
224.071.000 |
| 1 |
15 |
M3 |
Batu 3 - 5 Cm - Pengaspalan Gang Ebu |
355.000 |
PBH |
5.325.000 |
5.325.000 |
0 |
5.325.000 |
| 2 |
11 |
M3 |
Batu 2 - 3 Cm - Pengaspalan Gang Ebu |
370.000 |
PBH |
4.070.000 |
4.070.000 |
0 |
4.070.000 |
| 3 |
11 |
M3 |
Batu 1 - 2 Cm (Split Jagung) - Pengaspalan Gang Ebu |
415.000 |
PBH |
4.565.000 |
4.565.000 |
0 |
4.565.000 |
| 4 |
8 |
M3 |
Split Halus / Pasir Penutup - Pengaspalan Gang Ebu |
375.000 |
PBH |
3.000.000 |
3.000.000 |
0 |
3.000.000 |
| 5 |
1642 |
Kg |
Aspal - Pengaspalan Gang Ebu |
19.000 |
PBH |
31.198.000 |
31.198.000 |
0 |
31.198.000 |
| 6 |
1 |
Paket |
Minyak Bakar/Solar - Pengaspalan Gang Ebu |
1.090.000 |
PBH |
1.090.000 |
1.090.000 |
0 |
1.090.000 |
| 7 |
305 |
Sak |
Semen - Pengaspalan Gang Ebu |
75.000 |
PBH |
22.875.000 |
22.875.000 |
0 |
22.875.000 |
| 8 |
31 |
M3 |
Pasir Cor - Pengaspalan Gang Ebu |
280.000 |
PBH |
8.680.000 |
8.680.000 |
0 |
8.680.000 |
| 9 |
37 |
M3 |
Koral Cor - Pengaspalan Gang Ebu |
330.000 |
PBH |
12.210.000 |
12.210.000 |
0 |
12.210.000 |
| 10 |
2 |
M3 |
Usuk 4/6, P=4m, Kayu Lokal - Pengaspalan Gang Ebu |
2.650.000 |
PBH |
5.300.000 |
5.300.000 |
0 |
5.300.000 |
| 11 |
36 |
Lembar |
Plywood 8mm - Pengaspalan Gang Ebu |
100.000 |
PBH |
3.600.000 |
3.600.000 |
0 |
3.600.000 |
| 12 |
120 |
Lonjor |
Besi 8mm - Pengaspalan Gang Ebu |
60.000 |
PBH |
7.200.000 |
7.200.000 |
0 |
7.200.000 |
| 13 |
10 |
Kg |
Kawat Bendrat - Pengaspalan Gang Ebu |
25.000 |
PBH |
250.000 |
250.000 |
0 |
250.000 |
| 14 |
41 |
Kg |
Paku - Pengaspalan Gang Ebu |
25.000 |
PBH |
1.025.000 |
1.025.000 |
0 |
1.025.000 |
| 15 |
19 |
M3 |
Batu 3 - 5 Cm - Pengaspalan Jalan Cendrawasih |
355.000 |
PBH |
6.745.000 |
6.745.000 |
0 |
6.745.000 |
| 16 |
15 |
M3 |
Batu 2 - 3 Cm - Pengaspalan Jalan Cendrawasih |
370.000 |
PBH |
5.550.000 |
5.550.000 |
0 |
5.550.000 |
| 17 |
15 |
M3 |
Batu 1 - 2 Cm (Split Jagung) - Pengaspalan Jalan Cendrawasih |
415.000 |
PBH |
6.225.000 |
6.225.000 |
0 |
6.225.000 |
| 18 |
10 |
M3 |
Split Halus / Pasir Penutup - Pengaspalan Jalan Cendrawasih |
375.000 |
PBH |
3.750.000 |
3.750.000 |
0 |
3.750.000 |
| 19 |
2142 |
Kg |
Aspal - Pengaspalan Jalan Cendrawasih |
19.000 |
PBH |
40.698.000 |
40.698.000 |
0 |
40.698.000 |
| 20 |
1 |
Paket |
Minyak Bakar / Solar - Pengaspalan Jalan Cendrawasih |
1.430.000 |
PBH |
1.430.000 |
1.430.000 |
0 |
1.430.000 |
| 21 |
276 |
Sak |
Semen - Pengaspalan Jalan Cendrawasih |
75.000 |
PBH |
20.700.000 |
20.700.000 |
0 |
20.700.000 |
| 22 |
28 |
M3 |
Pasir Cor - Pengaspalan Jalan Cendrawasih |
280.000 |
PBH |
7.840.000 |
7.840.000 |
0 |
7.840.000 |
| 23 |
34 |
M3 |
Koral Cor - Pengaspalan Jalan Cendrawasih |
330.000 |
PBH |
11.220.000 |
11.220.000 |
0 |
11.220.000 |
| 24 |
2 |
M3 |
Usuk 4/6, P=4m, Kayu Lokal - Pengaspalan Jalan Cendrawasih |
2.650.000 |
PBH |
5.300.000 |
5.300.000 |
0 |
5.300.000 |
| 25 |
33 |
Lembar |
Plywood 8 mm - Pengaspalan Jalan Cendrawasih |
100.000 |
PBH |
3.300.000 |
3.300.000 |
0 |
3.300.000 |
| 26 |
37 |
Kg |
Paku - Pengaspalan Jalan Cendrawasih |
25.000 |
PBH |
925.000 |
925.000 |
0 |
925.000 |
| 5.2.1.08. Belanja Bendera/Umbul-umbul/Spanduk |
PBH |
200.000 |
200.000 |
60.000 |
140.000 |
| 27 |
1 |
Buah |
Papan Kegiatan - Pengaspalan Gang Ebu |
100.000 |
PBH |
100.000 |
100.000 |
0 |
100.000 |
| 28 |
1 |
Buah |
Papan Kegiatan - Pengaspalan Jalan Cendrawasih |
100.000 |
PBH |
100.000 |
100.000 |
60.000 |
40.000 |
| 5.2.2.01. Belanja Jasa Honorarium Tim Pelaksana Kegiatan |
PBH |
4.200.000 |
4.200.000 |
0 |
4.200.000 |
| 29 |
1 |
Ok |
Ketua - Pengaspalan Gang Ebu |
800.000 |
PBH |
800.000 |
800.000 |
0 |
800.000 |
| 30 |
1 |
Ok |
Sekretaris - Pengaspalan Gang Ebu |
700.000 |
PBH |
700.000 |
700.000 |
0 |
700.000 |
| 31 |
1 |
Ok |
Anggota - Pengaspalan Gang Ebu |
600.000 |
PBH |
600.000 |
600.000 |
0 |
600.000 |
| 32 |
1 |
OK |
Ketua - Pengaspalan Jalan Cendrawasih |
800.000 |
PBH |
800.000 |
800.000 |
0 |
800.000 |
| 33 |
1 |
OK |
Sekretaris - Pengaspalan Jalan Cendrawasih |
700.000 |
PBH |
700.000 |
700.000 |
0 |
700.000 |
| 34 |
1 |
OK |
Anggota - Pengaspalan Jalan Cendrawasih |
600.000 |
PBH |
600.000 |
600.000 |
0 |
600.000 |
| 5.2.2.94. Belanja Jasa Upah |
PBH |
102.255.000 |
102.255.000 |
0 |
102.255.000 |
| 35 |
4 |
HOK |
Operator - Pengaspalan Gang Ebu |
175.000 |
PBH |
700.000 |
700.000 |
0 |
700.000 |
| 36 |
284 |
HOK |
Pekerja - Pengaspalan Gang Ebu |
125.000 |
PBH |
35.500.000 |
35.500.000 |
0 |
35.500.000 |
| 37 |
71 |
HOK |
Tukang - Pengaspalan Gang Ebu |
170.000 |
PBH |
12.070.000 |
12.070.000 |
0 |
12.070.000 |
| 38 |
20 |
HOK |
Kepala Tukang - Pengaspalan Gang Ebu |
175.000 |
PBH |
3.500.000 |
3.500.000 |
0 |
3.500.000 |
| 39 |
5 |
HOK |
Operator - Pengaspalan Jalan Cendrawasih |
175.000 |
PBH |
875.000 |
875.000 |
0 |
875.000 |
| 40 |
290 |
HOK |
Pekerja - Pengaspalan Jalan Cendrawasih |
125.000 |
PBH |
36.250.000 |
36.250.000 |
0 |
36.250.000 |
| 41 |
58 |
HOK |
Tukang - Pengaspalan Jalan Cendrawasih |
170.000 |
PBH |
9.860.000 |
9.860.000 |
0 |
9.860.000 |
| 42 |
20 |
HOK |
Kepala Tukang - Pengaspalan Jalan Cendrawasih |
175.000 |
PBH |
3.500.000 |
3.500.000 |
0 |
3.500.000 |
| 5.2.4.02. Belanja Jasa Sewa Peralatan/Perlengkapan |
PBH |
24.750.000 |
24.750.000 |
0 |
24.750.000 |
| 43 |
4 |
Hari |
Sewa Wales - Pengaspalan Gang Ebu |
2.000.000 |
PBH |
8.000.000 |
8.000.000 |
0 |
8.000.000 |
| 44 |
4 |
Hari |
Sewa Aspal Finisher - Pengaspalan Gang Ebu |
750.000 |
PBH |
3.000.000 |
3.000.000 |
0 |
3.000.000 |
| 45 |
5 |
Hari |
Sewa Wales - Pengaspalan Jalan Cendrawasih |
2.000.000 |
PBH |
10.000.000 |
10.000.000 |
0 |
10.000.000 |
| 46 |
5 |
Hari |
Sewa Aspal Finisher - Pengaspalan Jalan Cendrawasih |
750.000 |
PBH |
3.750.000 |
3.750.000 |
0 |
3.750.000 |
| 5.2.5.99. Belanja Operasional Perkantoran lainnya |
PBH |
1.900.000 |
1.900.000 |
359.936 |
1.540.064 |
| 47 |
1 |
Paket |
BPJS Ketenagakerjaan - Pengaspalan Gang Ebu |
950.000 |
PBH |
950.000 |
950.000 |
0 |
950.000 |
| 48 |
1 |
Paket |
BPJS Ketenagakerjaan - Pengaspalan Jalan Cendrawasih |
950.000 |
PBH |
950.000 |
950.000 |
359.936 |
590.064 |
| 02.2004.02.03.12. Pembangunan/Rehabilitasi/Peningkatan/Pengerasan Jalan Usaha Tani **) (PK. Kepala Seksi Kesejahteraan) |
| 5.2.2.01. Belanja Jasa Honorarium Tim Pelaksana Kegiatan |
PBH |
750.000 |
750.000 |
0 |
750.000 |
| 49 |
1 |
Ok |
Ketua - Plat Beton Jalan Traktor |
300.000 |
PBH |
300.000 |
300.000 |
0 |
300.000 |
| 50 |
1 |
OK |
Sekretaris - Plat Beton Jalan Traktor |
250.000 |
PBH |
250.000 |
250.000 |
0 |
250.000 |
| 51 |
1 |
OK |
Anggota - Plat Beton Jalan Traktor |
200.000 |
PBH |
200.000 |
200.000 |
0 |
200.000 |
| 5.2.5.99. Belanja Operasional Perkantoran lainnya |
PBH |
240.000 |
240.000 |
0 |
240.000 |
| 52 |
1 |
Paket |
BPJS Ketenagakerjaan - Plat Beton Jalan Traktor |
240.000 |
PBH |
240.000 |
240.000 |
0 |
240.000 |
| 02.2004.02.03.20. Pembangunan/Rehabilitasi/Peningkatan Monumen/Gapura/Batas Desa **) (PK. Kepala Seksi Kesejahteraan) |
| 5.2.1.07. Belanja Bahan Material |
PBH |
35.462.000 |
35.462.000 |
0 |
35.462.000 |
| 53 |
1 |
Paket |
Belanja Bahan Material - Penataan Patung Pertigaan Kebon Kaja |
35.462.000 |
PBH |
35.462.000 |
35.462.000 |
0 |
35.462.000 |
| 5.2.1.08. Belanja Bendera/Umbul-umbul/Spanduk |
PBH |
100.000 |
100.000 |
0 |
100.000 |
| 54 |
1 |
Buah |
Papan Kegiatan - Penataan Patung Pertigaan Kebon Kaja |
100.000 |
PBH |
100.000 |
100.000 |
0 |
100.000 |
| 5.2.2.01. Belanja Jasa Honorarium Tim Pelaksana Kegiatan |
PBH |
1.500.000 |
1.500.000 |
0 |
1.500.000 |
| 55 |
1 |
Ok |
Ketua - Penataan Patung Pertigaan Kebon Kaja |
600.000 |
PBH |
600.000 |
600.000 |
0 |
600.000 |
| 56 |
1 |
OK |
Sekretaris - Penataan Patung Pertigaan Kebon Kaja |
500.000 |
PBH |
500.000 |
500.000 |
0 |
500.000 |
| 57 |
1 |
OK |
Anggota - Penataan Patung Pertigaan Kebon Kaja |
400.000 |
PBH |
400.000 |
400.000 |
0 |
400.000 |
| 5.2.2.94. Belanja Jasa Upah |
PBH |
42.810.000 |
42.810.000 |
0 |
42.810.000 |
| 58 |
1 |
Paket |
Belanja Jasa Upah - Penataan Patung Pertigaan Kebon Kaja |
42.810.000 |
PBH |
42.810.000 |
42.810.000 |
0 |
42.810.000 |
| 5.2.5.99. Belanja Operasional Perkantoran lainnya |
PBH |
240.000 |
240.000 |
0 |
240.000 |
| 59 |
1 |
Paket |
BPJS Ketenagakerjaan - Penataan Patung Pertigaan Kebon Kaja |
240.000 |
PBH |
240.000 |
240.000 |
0 |
240.000 |
| 02.2004.02.04.03. Pemeliharaan Sumber Air Bersih Milik Desa (Mata Air, Penampung Air, Sumur Bor dll) (PK. Kepala Seksi Kesejahteraan) |
| 5.2.1.07. Belanja Bahan Material |
PBH |
29.150.000 |
29.150.000 |
0 |
29.150.000 |
| 60 |
143 |
Sak |
Semen - Jalan Taman Megenda |
75.000 |
PBH |
10.725.000 |
10.725.000 |
0 |
10.725.000 |
| 61 |
11 |
M3 |
Pasir Cor - Jalan Taman Megenda |
280.000 |
PBH |
3.080.000 |
3.080.000 |
0 |
3.080.000 |
| 62 |
13 |
M3 |
Koral Cor - Jalan Taman Megenda |
330.000 |
PBH |
4.290.000 |
4.290.000 |
0 |
4.290.000 |
| 63 |
9 |
M3 |
Pasir Pasang - Jalan Taman Megenda |
295.000 |
PBH |
2.655.000 |
2.655.000 |
0 |
2.655.000 |
| 64 |
2400 |
Buah |
Batako - Jalan Taman Megenda |
3.500 |
PBH |
8.400.000 |
8.400.000 |
0 |
8.400.000 |
| 5.2.1.08. Belanja Bendera/Umbul-umbul/Spanduk |
PBH |
100.000 |
100.000 |
0 |
100.000 |
| 65 |
1 |
Buah |
Papan Kegiatan - Jalan Taman Megenda |
100.000 |
PBH |
100.000 |
100.000 |
0 |
100.000 |
| 5.2.2.01. Belanja Jasa Honorarium Tim Pelaksana Kegiatan |
PBH |
1.500.000 |
1.500.000 |
0 |
1.500.000 |
| 66 |
1 |
OK |
Ketua - Jalan Taman Megenda |
600.000 |
PBH |
600.000 |
600.000 |
0 |
600.000 |
| 67 |
1 |
Ok |
Sekretaris - Jalan Taman Megenda |
500.000 |
PBH |
500.000 |
500.000 |
0 |
500.000 |
| 68 |
1 |
OK |
Anggota - Jalan Taman Megenda |
400.000 |
PBH |
400.000 |
400.000 |
0 |
400.000 |
| 5.2.2.94. Belanja Jasa Upah |
PBH |
24.980.000 |
24.980.000 |
0 |
24.980.000 |
| 69 |
141 |
HOK |
Pekerja - Jalan Taman Megenda |
125.000 |
PBH |
17.625.000 |
17.625.000 |
0 |
17.625.000 |
| 70 |
34 |
HOK |
Tukang - Jalan Taman Megenda |
170.000 |
PBH |
5.780.000 |
5.780.000 |
0 |
5.780.000 |
| 71 |
9 |
HOK |
Kepala Tukang - Jalan Taman Megenda |
175.000 |
PBH |
1.575.000 |
1.575.000 |
0 |
1.575.000 |
| 5.2.5.99. Belanja Operasional Perkantoran lainnya |
PBH |
240.000 |
240.000 |
0 |
240.000 |
| 72 |
1 |
Paket |
BPJS Ketenagakerjaan - Jalan Taman Megenda |
240.000 |
PBH |
240.000 |
240.000 |
0 |
240.000 |
| 02.2004.03.02.05. Pembangunan/Rehabilitasi Sarana Prasarana Kebudayaan/Rumah Adat/Kegamaan Milik Desa **) (PK. Kepala Seksi Kesejahteraan) |
| 5.2.1.07. Belanja Bahan Material |
PBH |
75.589.000 |
75.589.000 |
0 |
75.589.000 |
| 73 |
6 |
Buah |
Kolom (Saka) - Rehab Piyasan Subak Belega |
3.000.000 |
PBH |
18.000.000 |
18.000.000 |
0 |
18.000.000 |
| 74 |
14 |
Buah |
Canggahwang - Rehab Piyasan Subak Belega |
525.000 |
PBH |
7.350.000 |
7.350.000 |
0 |
7.350.000 |
| 75 |
24 |
Meter |
Lambang - Rehab Piyasan Subak Belega |
400.000 |
PBH |
9.600.000 |
9.600.000 |
0 |
9.600.000 |
| 76 |
56 |
Batang |
Usuk ExPose - Rehab Piyasan Subak Belega |
150.000 |
PBH |
8.400.000 |
8.400.000 |
0 |
8.400.000 |
| 77 |
16 |
Batang |
Apit-Apit - Rehab Piyasan Subak Belega |
150.000 |
PBH |
2.400.000 |
2.400.000 |
0 |
2.400.000 |
| 78 |
24 |
M2 |
Gerantang - Rehab Piyasan Subak Belega |
250.000 |
PBH |
6.000.000 |
6.000.000 |
0 |
6.000.000 |
| 79 |
28 |
Meter |
Lisplank, 2/10 - Rehab Piyasan Subak Belega |
110.000 |
PBH |
3.080.000 |
3.080.000 |
0 |
3.080.000 |
| 80 |
28 |
Meter |
Cacab, 2/7 - Rehab Piyasan Subak Belega |
80.000 |
PBH |
2.240.000 |
2.240.000 |
0 |
2.240.000 |
| 81 |
28 |
Meter |
Ring-Ring - Rehab Piyasan Subak Belega |
250.000 |
PBH |
7.000.000 |
7.000.000 |
0 |
7.000.000 |
| 82 |
900 |
Buah |
Genteng - Rehab Piyasan Subak Belega |
8.000 |
PBH |
7.200.000 |
7.200.000 |
0 |
7.200.000 |
| 83 |
90 |
Buah |
Bubungan - Rehab Piyasan Subak Belega |
35.000 |
PBH |
3.150.000 |
3.150.000 |
0 |
3.150.000 |
| 84 |
1 |
Buah |
Mudra - Rehab Piyasan Subak Belega |
475.000 |
PBH |
475.000 |
475.000 |
0 |
475.000 |
| 85 |
4 |
Buah |
Ikut Celedu - Rehab Piyasan Subak Belega |
100.000 |
PBH |
400.000 |
400.000 |
0 |
400.000 |
| 86 |
6 |
Kg |
Paku - Rehab Piyasan Subak Belega |
25.000 |
PBH |
150.000 |
150.000 |
0 |
150.000 |
| 87 |
24 |
Buah |
Baut 10 Cm - Rehab Piyasan Subak Belega |
6.000 |
PBH |
144.000 |
144.000 |
0 |
144.000 |
| 5.2.1.08. Belanja Bendera/Umbul-umbul/Spanduk |
PBH |
100.000 |
100.000 |
0 |
100.000 |
| 88 |
1 |
Buah |
Papan Kegiatan - Rehab Piyasan Subak Belega |
100.000 |
PBH |
100.000 |
100.000 |
0 |
100.000 |
| 5.2.2.01. Belanja Jasa Honorarium Tim Pelaksana Kegiatan |
PBH |
1.500.000 |
1.500.000 |
0 |
1.500.000 |
| 89 |
1 |
OK |
Ketua - Rehab Piyasan Subak Belega |
600.000 |
PBH |
600.000 |
600.000 |
0 |
600.000 |
| 90 |
1 |
OK |
Sekretaris - Rehab Piyasan Subak Belega |
500.000 |
PBH |
500.000 |
500.000 |
0 |
500.000 |
| 91 |
1 |
OK |
Anggota - Rehab Piyasan Subak Belega |
400.000 |
PBH |
400.000 |
400.000 |
0 |
400.000 |
| 5.2.2.94. Belanja Jasa Upah |
PBH |
28.950.000 |
28.950.000 |
0 |
28.950.000 |
| 92 |
104 |
HOK |
Pekerja - Rehab Piyasan Subak Belega |
125.000 |
PBH |
13.000.000 |
13.000.000 |
0 |
13.000.000 |
| 93 |
65 |
HOK |
Tukang - Rehab Piyasan Subak Belega |
170.000 |
PBH |
11.050.000 |
11.050.000 |
0 |
11.050.000 |
| 94 |
28 |
HOK |
Kepala Tukang - Rehab Piyasan Subak Belega |
175.000 |
PBH |
4.900.000 |
4.900.000 |
0 |
4.900.000 |
| 5.2.5.99. Belanja Operasional Perkantoran lainnya |
PBH |
950.000 |
950.000 |
0 |
950.000 |
| 95 |
1 |
Paket |
BPJS Ketenagakerjaan - Rehab Piyasan Subak Belega |
950.000 |
PBH |
950.000 |
950.000 |
0 |
950.000 |
| 02.2004.03.03.04. Pemeliharaan Sarana dan Prasarana Kepemudaan dan Olahraga Milik Desa (PK. Kepala Seksi Kesejahteraan) |
| 5.2.1.07. Belanja Bahan Material |
PBH |
30.000.000 |
30.000.000 |
28.805.577 |
1.194.423 |
| 96 |
1 |
Paket |
Sekat Ruangan - Peningkatan Sorga Desa |
30.000.000 |
PBH |
30.000.000 |
30.000.000 |
28.805.577 |
1.194.423 |
| 02.2004.04.02.03. Penguatan Ketahanan Pangan Tingkat Desa (Lumbung Desa dll) (PK. Kepala Seksi Kesejahteraan) |
| 5.2.1.12. Belanja Pupuk/Obat-obatan Pertanian |
PBH |
12.620.000 |
12.620.000 |
218.000 |
12.402.000 |
| 97 |
25 |
Buah |
Trai Bibit - Puspa aman |
25.000 |
PBH |
625.000 |
625.000 |
218.000 |
407.000 |
| 98 |
351 |
Kampil |
Tanah Subur - Puspa aman |
15.000 |
PBH |
5.265.000 |
5.265.000 |
218.000 |
5.047.000 |
| 99 |
1 |
Paket |
Obat Pertanian - Puspa aman |
500.000 |
PBH |
500.000 |
500.000 |
218.000 |
282.000 |
| 100 |
1 |
Paket |
Bibit Tanaman/Hewan Pangan - Puspa aman |
4.000.000 |
PBH |
4.000.000 |
4.000.000 |
218.000 |
3.782.000 |
| 101 |
1 |
Roll |
Selang - Puspa aman |
600.000 |
PBH |
600.000 |
600.000 |
218.000 |
382.000 |
| 102 |
4 |
Buah |
Cangkul - Puspa aman |
85.000 |
PBH |
340.000 |
340.000 |
218.000 |
122.000 |
| 103 |
4 |
Buah |
Sabit - Puspa aman |
60.000 |
PBH |
240.000 |
240.000 |
218.000 |
22.000 |
| 104 |
30 |
Bungkus |
Pollybag - Puspa aman |
35.000 |
PBH |
1.050.000 |
1.050.000 |
218.000 |
832.000 |
| 5.2.2.94. Belanja Jasa Upah |
PBH |
12.000.000 |
12.000.000 |
4.000.000 |
8.000.000 |
| 105 |
96 |
OH |
Upah Pekerja Puspa aman - Puspa aman |
125.000 |
PBH |
12.000.000 |
12.000.000 |
4.000.000 |
8.000.000 |
| 02.2004.05.01.00. Kegiatan Penanggulangan Bencana (PK. Kepala Seksi Kesejahteraan) |
| 5.4.1.01. Belanja Tidak Terduga |
ADD,DLL,PAD,PBH |
86.831.572 |
86.831.572 |
4.548.000 |
82.283.572 |
| 106 |
1 |
Tahun |
Kegiatan Penanggulangan Bencana - Kegiatan Penanggulangan Bencana |
2.690.007 |
PBH |
2.690.007 |
2.690.007 |
1.746.000 |
944.007 |